| 
Railhub Archive 2000-10-22 ANG-001 Anglia Railways0
Current information concerning train delays and forthcoming emergency timetable.
keywords: click to search
 Anglia Railways
 Hatfield
 
Phrases in [single square brackets] are hyperlinks in the original document
Phrases in [[double square brackets]] are editorial additions or corrections
Phrases in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.) | | 
       Current information concerning train delays and forthcoming emergency timetable. _______________________________________________________________
 type Press release
Anglia Railways is working with Railtrack to produce an emergency timetable that will be implemented from the middle of next week and will remain in place until the end of the year. It is hoped, however, that as Railtrack complete their work in stages, improvements will be made to the emergency timetable. Until the emergency timetable is implemented trains between Norwich and London will be subject to delays of up to 30 minutes.
From Monday 23 October London Crosslink services between East Anglia and Basingstoke will run, but with a reduced level of service – trains on this route will mostly operate between Stratford and Basingstoke.
Further information will follow as soon as possible.
Railhub Archive ::: 2000-10-22 ANG-001
 | | 

Sunday 31















  15 stories

  1 collection

  2 documents

| |