Railhub Archive 2012-07-16 DfT-001 Department for Transport0
High Level Output Specification (HLOS) 2012: Railways Act 2005 statement
keywords: click to search
 Crossrail
 East West rail link
 Great Western Main Line
 GWML
 Midland Main Line
 MML
 Sheffield
 Swansea
 Thameslink Programme
 capital spending plans
 electrification
 railway investment
 
Phrases in [single square brackets] are hyperlinks in the original document
Phrases in [[double square brackets]] are editorial additions or corrections
Phrases in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.) | | 
         High Level Output Specification (HLOS) 2012: Railways Act 2005 statement _______________________________________________________________
 type Policy paper
The High Level Output Specification (HLOS) sets out information for the Office of Rail Regulation and for the rail industry about what the Secretary of State wants to be achieved by railway activities during railway Control Period 5 (April 2014 – March 2019). The HLOS is a statutory requirement introduced by the Railways Act 2005. Secretary of State for Transport’s Guidance to the Office of Rail Regulation This is general guidance issued by the Secretary of State to the Office of Rail Regulation (ORR) under the terms of the Railways Act 1993. The ORR must take account of this guidance in carrying out its functions as economic and safety regulator for the railways.
Illustrative Option schemes in CP5 HLOS Alongside HLOS, Government publishes an illustrative option. This sets out the list of projects that Government considers might be required to deliver the high level outputs that it specifies. Government looks to the rail industry to improve and find better ways of delivering the HLOS outputs.