| 
Railhub Archive 2015-01-15 NET-001 Network Rail0
Network Rail apologises to passengers and tackles reliability problem at London Bridge
keywords: click to search
 Network Rail
 maintenance
 
Phrases in [single square brackets] are hyperlinks in the original document
Phrases in [[double square brackets]] are editorial additions or corrections
Phrases in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.) | | 
         Network Rail apologises to passengers and tackles reliability problem at London Bridge _______________________________________________________________

 date 15 January 2015 source Network Rail
type Press release
London & South East National
Network Rail has apologised to passengers after equipment on the railway near London Bridge has proved unreliable and caused delays this week.
The equipment, which includes a set of points at a junction east of London Bridge station near New Cross Gate, has not provided the reliability expected and engineers are tackling the problem.
Thameslink programme director Simon Blanchflower said: "Passengers and operators expect equipment to work reliably and so do we. We realise the quality of the service we have offered around London Bridge has not been good enough this week and we are doing everything we can to get to the root of the problems.
"We have already undertaken a great deal of work on site and we have identified the key equipment that needs to be tackled.
"The Thameslink Programme is a huge undertaking that will bring a big improvement to travel through London Bridge, but in the meantime we are working hard to improve the services people are relying on today."
Notes to editors
Temporary timetable changes are planned for this evening and tomorrow evening.
Railhub Archive ::: 2015-01-15 NET-001
 | | 


  9 documents

  6 collections


 
  1 document

| |