Saturday 16 October 2021

 

< back | business | images | knowledge | library | rail unveiled | home

archive

::: RMT threatens national industrial action over service cuts



Railhub Archive
2001-03-02 ANG-001
Anglia Railways

0

Important information for rail passengers


keywords: click to search


accidents
Great Heck
London Crossrail



Phrases in [single square brackets] are hyperlinks in the original document

Phrases in [[double square brackets]] are editorial additions or corrections

Phrases in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.)


Anglia Railways

Important information for rail passengers
_______________________________________________________________


related documents


2001-02-02 Ipswich and Cambridge/Peterborough services (Anglia Railways)

2001-02-01 Changes to Anglia Railways’ local train services (Anglia Railways)

_______________________________________________________________


date
2 March 2001
source Anglia Railways
type Press release



The re-introduction of 4 Anglia Railways’ services between Stratford and Basingstoke to restore the amended London Crosslink timetable will take place from Monday 5 March.

Between 28 February and 4 March the temporary cancellation of 4 London Crosslink services was undertaken in order to provide additional trains to Anglia Railways’ sister company, Hull Trains following the tragic rail accident at Great Heck, near Doncaster. This approach enabled Hull Trains to double the seating capacity on all their services between Hull, Doncaster and London, thereby providing valuable additional seats for travellers on the East Coast Main Line during a difficult period. The move was part of an industry-wide response agreed with the Strategic Rail Authority.

From Monday 5 March the 06.20 Hull – London and 16.03 London – Hull (the busiest trains) will continue to run with double the seating capacity for the rest of the week or until the East Coast Main Line reopens.

However, the return of one train to Anglia Railways will enable the following London Crosslink services to be restored and operate from Monday 5 March onwards :

08.04 and 14.04 services from Stratford to Basingstoke

10.32 and 16.32 services from Basingstoke to Stratford


Railhub Archive ::: 2001-03-02 ANG-001





Saturday
16




Not logged on
Visitor










2 stories



3 documents



4 collections